- Start work construction 2019.10.11
set line furniture to worker and detail on site
- Set leveling floor and prepare furniture in factory
- Update work construction 2019.10.18
- installation air condition and prepare main water
- prepare work for install tile
- setting leveling floor complete and paint waterproof concrete before install tile
- Update work construction 2019.10.25 - Prepare work furniture in factory - Setting line wall for furniture and wall some part
- Update work construction 2019.11.1
- Installation pipe air system
- Installation electrical wire and main electrical
- Install work build in some part
- Install pipe for water system
- Ceiling Some part
- Prepare work for install Aluminium window
- Update work construction 2019.11.15 - Install Ceiling Some part
- Support door slide
- Change aluminium door and window
- Update work construction 2019.12.13 - Install Furniture
- Paint ceiling
- Update work construction 2019.12.20 - Spray Paint furniture
- Paint ceiling
- Prepare Laminate floor