2018.04.19 On site recheck for m&e work and Ceiling work
2018.04.26 On site recheck for m&e work and Ceiling work
2018.05.03 On site recheck for m&e work and Install furniture built-in
2018.05.10 On site recheck for m&e work,Install furniture built-in and update schedule
2018.05.17 On site recheck for floor tile work,Install furniture built-in
2018.05.24 On site recheck for floor tile work,Install furniture built-in and polishing wooden floor
2018.05.31 On site recheck for floor tile work,Install furniture built-in main kitchen
2018.06.07 On site recheck for floor tile work,Install furniture built-in
2018.06.21 On site recheck for furniture built-in and moved loose furniture to position.
2018.07.03 Preview of the end.